Nakul Tooke, our Construction Manager will arrange a final check measure of the project. Nakul will ring to organise a time to come out and finalise details of your contracted works. Nakul will go over the design, finalise the colours, check measurements and clarify any other aspects of your project. Once the check measure has been completed, the materials for your project will then be ordered, and your project will be placed in the construction calendar waiting to commence! Nakul will advise an anticipated construction start date or approximate wait time before construction will commence.
During the design consultation, Nakul will meet with you and discuss your outdoor living and entertaining plans. During this meeting Nakul will undertake a site analysis to identify design solutions that capitalise on your homes strengths, and opportunities. Nakul will then brief you on possible design solutions and with your input will present a concept design. This concept design will then be presented in a detailed proposal with specifications and pricing for your perusal.
Many of our projects require some form of approval and we have made it super easy for our clients to navigate through this. Depending on the type of approval, this could take up to 6 – 8 weeks. If you have had any previous renovations completed on your home – we will request copies of approval documents, drawings, plans and surveys as these can be used to expedite the preliminary stages of the approval process.